[webco-beta] Integration test?

David Cramton cramtond@evergreen.edu
Thu, 25 Sep 2003 15:20:42 -0700


I was wondering if you folks had done a dry run of our integration 
routine on the 3.1 yet.  If not, would it be possible to do so before 
the upgrade, whenever that happens?  I just want to see that our bases 
are covered.

Thanks.
-Dave